Led people and lab operating systems—not just equipment: Monday.com demand visibility, weekly close-out, calibration into QMS, and a multi-variant UL 60335 program across 30+ HVAC units. Result: +25% productivity and a durable path to keep more compliance testing in-house on the ISO/IEC 17025 trajectory.

People: 4 direct reports · Predictability: scheduled test demand + weekly close-out reports · Compliance: UL 60335 with production qualification.

4Direct reports
25%Productivity gain
30+HVAC variants (UL 60335)
ISO 17025QMS / in-house test path

▣People + operating system, not just equipment

I managed four direct reports in a technical NPD lab and raised team productivity by 25%. The leadership work was the schedule and the close-out loop: Monday.com for all resources and test requests, weekly meetings, weekly communication, and generated reports to close work—so demand and capacity were visible and finished work actually closed.

I also created a calibration system for internal tools and equipment that fed the lab QMS—turning metrology discipline into something the quality system could depend on, not tribal knowledge.

Conceptual NPD lab operations diagram: team schedule, close-out loop, and calibration into QMS
Illustrative lab operating model—the demand the schedule and close-out loop had to protect. Conceptual graphic, not facility photography.

◇Compliance program & QMS

Led cross-functional execution of an electrical product compliance initiative covering 30+ HVAC variants to meet UL 60335—interpreting requirements, closing gaps, coordinating tests, and working with UL. Coordinated production qualification and change implementation (DFx — DFM/DFA/DFT/DFS/DFR, DFMEA, FAI, PPAP/PAPSO).

Built and deployed a lab quality management system supporting ISO/IEC 17025 accreditation direction, reducing reliance on external test labs. Tightened project cost discipline and inventory/material flow so storage and spend stayed under control. LabVIEW-supported hardware upgrades and automation were part of the capability build.

Industrial safety and validation checklist for compliance and qualification work
Compliance and validation discipline—requirements interpretation through controlled implementation.

⬡Hands-on product reality

The lab supported fan-coil and blower-coil equipment, heaters, and controls-equipped air-conditioning units. I stayed in the build/test loop—prototype construction, programming, controls troubleshooting—so program decisions stayed grounded in physical behavior.

Conceptual prototype test loop diagram for blower performance checks and controls troubleshooting
Illustrative prototype test loop—hands-on validation that kept UL 60335 and QMS decisions grounded in physical behavior. Conceptual graphic, not facility photography.

What carried forward

Make demand visible (Monday.com), run a weekly cadence, close work with reports, and put quality-critical systems (calibration → QMS) under managed control—the same habits that later showed up in hardware program work at iA.

Key learnings

Repeat

People productivity moved when demand and close-out were visible—not when equipment alone improved. Schedule + weekly reports beat tribal “who’s on what.”

Do differently

Pair compliance interpretation with earlier DFMEA/FAI capacity so UL 60335 variant work and lab bandwidth don’t compete silently.

Tools & operating systems I put in place

Built

Monday.com lab schedule

All resources and test requests in one system; weekly meetings and reports to close.

Built

Calibration system → QMS

Internal tools/equipment calibration managed as an input to the lab quality system.

Led

4 direct reports

Coaching, workload, competency—tied to a measured 25% productivity gain.

Owned

UL 60335 compliance program

30+ HVAC variants with production qualification and change implementation.

Evidence: Résumé-backed outcomes (productivity, UL program scope, QMS / in-house test path); Monday.com / calibration / weekly reporting practices as described. Program references available on request.