Led people and lab operating systems—not just equipment: Monday.com demand visibility, weekly close-out, calibration into QMS, and a multi-variant UL 60335 program across 30+ HVAC units. Result: +25% productivity and a durable path to keep more compliance testing in-house on the ISO/IEC 17025 trajectory.
▣People + operating system, not just equipment
I managed four direct reports in a technical NPD lab and raised team productivity by 25%. The leadership work was the schedule and the close-out loop: Monday.com for all resources and test requests, weekly meetings, weekly communication, and generated reports to close work—so demand and capacity were visible and finished work actually closed.
I also created a calibration system for internal tools and equipment that fed the lab QMS—turning metrology discipline into something the quality system could depend on, not tribal knowledge.
◇Compliance program & QMS
Led cross-functional execution of an electrical product compliance initiative covering 30+ HVAC variants to meet UL 60335—interpreting requirements, closing gaps, coordinating tests, and working with UL. Coordinated production qualification and change implementation (DFx — DFM/DFA/DFT/DFS/DFR, DFMEA, FAI, PPAP/PAPSO).
Built and deployed a lab quality management system supporting ISO/IEC 17025 accreditation direction, reducing reliance on external test labs. Tightened project cost discipline and inventory/material flow so storage and spend stayed under control. LabVIEW-supported hardware upgrades and automation were part of the capability build.
⬡Hands-on product reality
The lab supported fan-coil and blower-coil equipment, heaters, and controls-equipped air-conditioning units. I stayed in the build/test loop—prototype construction, programming, controls troubleshooting—so program decisions stayed grounded in physical behavior.
What carried forward
Make demand visible (Monday.com), run a weekly cadence, close work with reports, and put quality-critical systems (calibration → QMS) under managed control—the same habits that later showed up in hardware program work at iA.
Key learnings
Repeat
People productivity moved when demand and close-out were visible—not when equipment alone improved. Schedule + weekly reports beat tribal “who’s on what.”
Do differently
Pair compliance interpretation with earlier DFMEA/FAI capacity so UL 60335 variant work and lab bandwidth don’t compete silently.
Tools & operating systems I put in place
Monday.com lab schedule
All resources and test requests in one system; weekly meetings and reports to close.
Calibration system → QMS
Internal tools/equipment calibration managed as an input to the lab quality system.
4 direct reports
Coaching, workload, competency—tied to a measured 25% productivity gain.
UL 60335 compliance program
30+ HVAC variants with production qualification and change implementation.