Demos menu
Part Viewer, capacity estimating, and operating-model labs—hands-on, separate from the writeups.
Operating systems for hardware NPI—gates, capacity, cost, and cross-domain contracts—into Director/VP decisions.
Default: build to scale, or refine to scale when the first version already works. Proof: high-value concurrent portfolio · 5 programs · 20–40 contributors.
Program ownership with technical depth—NPI, integration, lab leadership, and scale-up—not task tracking.
Own end-to-end execution for 5 concurrent HW/SW programs across a high-value product portfolio; 20–40 cross-functional contributors. Schedules, WBS, dependency maps, NPI readiness, ECR/ECO/BOM, VAVE (92 opportunities / 24 implemented / validated cost avoidance), and executive reviews with hardware risk & dependency registers on every active program. With Manufacturing and Quality, drive 8D/RCCA containment when factory or field issues hit the critical path. Use Claude, Cursor, and Codex to build AI workflows and internal tools (RAID, status, phase-gate, VAVE, dashboards) on top of Smartsheet and Outlook.
Open the case →Managed 4 direct reports (+25% productivity). Led UL 60335 compliance across 30+ HVAC variants. Built lab QMS toward ISO/IEC 17025 and reduced reliance on external test labs. Authored SOPs for AHRI / ASHRAE / UL / AMCA test execution. Monday.com resource/test schedule, weekly close-out reporting, and equipment calibration system for QMS.
Open the case →Mammalian cell culture experiments: centrifuge/isolation (50–5,000 L); separate E. coli IB homogenization and small-molecule hydrocyclone LLE. Built a MIMIC Simulation Software utilities HMI trainer; isolation DOE/JMP improved reliability and delivery timelines by 33%.
Open the case →Hardware delivery, program systems I build and run, and the tools behind them.
Problem, ownership, hard tradeoffs, tools/operating systems, executive reporting, and outcomes. Prefer clicking first? Open the demos menu →
Part Viewer, capacity estimating, and operating-model labs—hands-on, separate from the writeups.
Owned engineering-to-production under customer schedules—including time-boxed configuration reconciliation back into formal control.
Shipped hardware↔software contract work while leadership held strategy—verification and commitment capture without freezing development.
Built VAVE end-to-end and hosted it as an internal tool with automated weekly report-outs for 7–15 stakeholders—92 opportunities, 24 implemented, validated cost avoidance.
Built the planning system and led role owners through adoption when no historical baseline existed—including LOE / t-shirt scoping into PERT.
People, QMS, Monday.com scheduling, calibration, UL 60335—and 25% lab productivity.
Mammalian cell culture centrifuge/isolation, E. coli IB homogenization, SM hydrocyclone LLE, MIMIC Simulation Software trainer—33% isolation DOE.
High-value concurrent portfolio, five programs, executive risk/dependency reporting on every active workstream.
The pattern behind the programs—productizing VAVE, capacity, cross-domain contracts, and readiness so others can run them.
Thoughts and illustrative examples on capacity, lifecycle ownership, and product-aligned teams—with an interactive model in the article.
Technical Program Leader with 10+ years driving end-to-end hardware product development across embedded systems, manufacturing, and cross-functional engineering organizations. Leads complex, multi-disciplinary programs spanning architecture, design, validation, and production readiness, aligning 20–40+ stakeholders across engineering, operations, and supply chain. Proven track record delivering concurrent high-value programs by building scalable execution frameworks, driving cross-functional dependency closure, and managing risk across full product lifecycles. Brings deep experience translating ambiguity into structured execution, enabling schedule recovery, improving system reliability, and scaling products from concept through production. Experienced in highly regulated and quality-critical environments, with a strong emphasis on system-level thinking, DFx (DFM, DFA, DFT, DFS, DFR), and cross-domain integration.
Path: process scale-up at Eli Lilly → NPD lab and compliance leadership at Johnson Controls → hardware/embedded TPM at iA. Founder of Pragmadex LLC (engineering/PM systems and other ventures) alongside full-time program work.
I'm most effective when dependencies need clear ownership, judgment, and mechanisms—especially without formal authority and with customer schedules on the critical path. Same facts, tailored for engineers vs Director/VP asks.